Construction Projects
All current and planned construction and reconstruction projects across the Township are listed in the chart below.
|
TYPE |
LOCATION |
LIMITS |
STATUS |
|
Culvert Replacement |
Road 124 |
Structure #60 |
August/September |
|
Culvert Replacement |
Road 102 |
Structure #5 |
August/September |
|
Culvert Replacement |
Line 39 |
Structure #40 |
August/September |
|
Road Resurfacing |
Line 42 |
Perth Road 119 to Road 150 |
Scheduled May/June 2012
|
|
Road Resurfacing |
Road 145
|
South Kinkora Limits to North Kinkora Limits |
Scheduled May/June 2012
|
|
Road Resurfacing |
Meadowview Drive
|
Line 42 Southerly 150 meters |
Scheduled May/June 2012
|
|
Storm Sewer Reconstruction |
Line 83 (Hesson) |
Perth Road 121 to #4568 |
Complete, Restoration planned spring 2012 |
|
Sidewalk Replacement
|
Main Street Milverton |
To be Determined
|
August/September |